The Gore Hill Interchange project represents a comprehensive, multi-phase effort that will transform one of the most critical transportation nodes along the I-15 corridor in Great Falls. The project evolved from an initial corridor planning study into detailed traffic engineering analysis and ultimately full design, resulting in a well-informed, context-sensitive solution that enhances safety, mobility, and long-term system performance.
Overview
RPA is providing comprehensive design services for improvements to the Gore Hill Interchange, a key access point serving local businesses, regional traffic, and the Great Falls International Airport. The project aims to reduce congestion, improve safety, and enhance overall traffic operations in a rapidly growing area. The design includes upgraded interstate ramps, two new roundabouts, a new overpass structure, rerouted frontage roads, and a new auxiliary lane along the interstate.
Challenge
The Gore Hill Interchange has experienced increasing congestion, safety concerns, and operational limitations due to regional growth and rising traffic volumes. The site presents several complex constraints, including limited right-of-way, closely spaced access points, adjacent frontage roads, high-traffic commercial uses, unstable soils, and an aging interstate bridge structure. These conditions created a challenging environment for developing improvements that balance safety, efficiency, constructability, and long-term performance.
Approach
RPA led all phases of project development, beginning with the I-15 Corridor Study, which evaluated system-wide conditions and identified the need for interchange improvements. Building on this foundation, the project advanced into a traffic engineering and alternatives analysis phase, where RPA conducted a detailed evaluation of potential solutions. During this phase, the team developed and analyzed 14 interchange concepts, ranging from minor operational improvements to full reconfiguration options such as frontage road realignments and a diverging diamond interchange.
Once a preferred configuration was identified, RPA led a multidisciplinary effort combining traffic engineering, roadway design, and environmental analysis to advance the project into final design. The project integrates stormwater management systems, geotechnical solutions, and modern lighting to support long-term performance and maintainability.
The design introduces two roundabouts and reconfigures frontage roads to improve traffic flow, reduce conflict points, and enhance access for all users. The result is a modernized interchange that improves operations and supports continued growth in the Great Falls area.
Key Project Elements
- Corridor planning and feasibility analysis
- Traffic operations modeling and alternatives analysis
- Preliminary and final design
- Ramp and frontage road reconstruction
- Roundabout and intersection improvements
- Auxiliary lane design
- Stormwater and drainage analysis
- Geotechnical and structural coordination
- Lighting, signing, and multimodal accommodations
Project Details
Client
Montana Department of Transportation (MDT)
Location
Great Falls, Montana